ESENSE
Structure de mise en forme 2 colonnes

Project News


25 July 2007

e-SENSE User Scenario

e-SENSE User Scenario available here!


D5.2.2 - Test Bed ? Upgrades


Description of the deliverable content and purpose

This deliverable describes the testbeds developed in WP5 and released at Milestone M5.4 and associated upgrades released at Milestone M5.5:

 

Testbed

Purpose

Relation to Show Case

Body Sensor Network

to validate the e-SENSE approach to context capture/availability by integrating WSNs with B3G/IMS systems

Show Case 1

Ambient Smart Signs

to validate e-SENSE concepts in context capture/awareness and localisation in an office/enterprise environment

Show Case 2

Letibee

to validate the e-SENSE approach to energy efficient communication via an IEEE 802.15.4-compliant low-power air interface

No relation

Mood Detection

to develop mood detection context capture algorithms

Show Case 3

Duty Cycle Control

To validate a duty cycling control scheme

No relation

Each testbed is described under the following headings:
? Testbed Objectives
? Relationship to Show Cases
? Testbed Architecture
? Functional & Technical Requirements
? Hardware Components
? Software Components
? Test Plan
? Test Results
? Relationship with other e-SENSE WPs
The broad purpose of the testbeds is to provide the infrastructure for the e-SENSE show cases and validate key e-SENSE architectural & technical concepts. The specific contribution of each testbed to this purpose is elaborated below.


 

e-SENSE Deliverables Request Form


This e-SENSE Deliverable is public and available to everybody without charge.

For internal statistics purpose we kindly ask you some personal information. You will be redirected to a webpage available for 24 hours from which you can download the document in PDF format.

(*) Mandatory fields